Print Run Cost Calculator

Enter setup cost, per-unit cost and quantity to get the total job cost and the true cost per piece.

Total: $300.00 • Unit: $0.30

Why quantity changes unit cost

Setup (plates, screens, digitizing, proofs) is paid once per job, so it is divided across every piece. 1,000 units at $0.25 each plus $50 setup is $300 total, or $0.30 each. At 100 units the same job costs $0.75 each. Use this to set sensible minimums and quantity breaks.

Frequently asked questions

How do I calculate cost per unit for printing?

Add the setup cost to unit cost × quantity, then divide the total by the quantity.

Related free tools

Stop pricing jobs in spreadsheets

PrintUnite runs quotes, orders, artwork, gang sheets and inventory for screen printing, DTF, embroidery and sublimation shops in one place. These tools are free; the platform is what they came from.